Building, Facilities and Mining in Olive Groves in Türkiye: Law No. 3573, Prohibitions and Legal Remedies

Text sizeTheme

Short answer: As a rule, no. Under Turkish law, Law No. 3573 art. 20 prohibits building or operating, within olive grove areas and within 3 kilometres of them, any facility that leaves chemical waste or emits dust and smoke such as to hinder the development of the olive groves; olive oil factories and small-scale agricultural industry enterprises are subject to Ministry permission. Olive grove areas may not be reduced; where a grove within municipal boundaries is brought within the zoning limits, total construction may not exceed 10% of the area, and uprooting trees requires permission. The “olive grove area” is not defined in the Law; the definition in the Regulation was annulled by the Council of State. For mining, provisional article 45, added to the Mining Law in 2025, opens a limited permission route only for the areas listed in the annex to the Law and for existing licences aimed at the country’s electricity needs. The time limit for an action against administrative acts is sixty days as a rule, and thirty days for EIA and urgent expropriation decisions.

This article explains Turkish law. It is an English translation of the Turkish original; in case of any discrepancy, the Turkish text prevails.

In brief

Under Turkish law, Law No. 3573 art. 20 prohibits facilities that leave chemical waste or emit dust and smoke within olive grove areas and within 3 kilometres of them; olive grove areas may not be reduced and uprooting trees requires permission. The article explains the source of the definition of an olive grove area, the annulled regulation provisions, provisional article 45 of the Mining Law and the remedies against EIA, mining and expropriation acts in Türkiye, with Council of State decisions.

Whether a facility, mine or building may be put up in or near an olive grove in Türkiye: the prohibitions in Law No. 3573 art. 20, permission to uproot trees, the 2025 statutory provision on mining, and the remedies under Turkish law.

What Is an Olive Grove Area? The Source of the Definition

Under Turkish law, the basic provision protecting olive groves is article 20 of Law No. 3573 on the Improvement of Olive Cultivation and the Grafting of Wild Olives. The article protects “olive grove areas” but does not define the term.

A definition was introduced by regulation in 2012. The definition added to article 4 of the Regulation on the Improvement of Olive Cultivation and the Grafting of Wild Olives also covered areas registered as such in the land registry and required “an area of at least 25 decares”. The same amendment added exceptions to article 23 for investments such as geothermal greenhouses, renewable energy and mining. These provisions still appear in italics in the official legislation system; but the footnote at the end of the Regulation states that the definition and article 23, except for its first two sentences, were annulled.

Regulation Footnote — Regulation on the Improvement of Olive Cultivation and the Grafting of Wild Olives art. 31 (footnote (1) under the article)

“By the decision of the Eighth Chamber of the Council of State dated 19/2/2015, File No. 2012/6113, Decision No. 2015/998, it was decided to annul the definition of ‘Olive Grove Area’ in article 4 of the Regulation and, as regards article 23, … the remainder other than those sentences.”

The reasoning of a decision of the 8th Chamber of the same date on the same provisions is reproduced in another Council of State decision (Council of State, 4th Chamber, E. 2024/3997, K. 2025/1706, 17.03.2025): the Law does not require a minimum size for an area to count as an olive grove area; the phrase “parcels of at least 25 dönüms” in article 3 concerns only the parcels to be allocated.

A letter of 08/06/2011 sent by the Ministry (today the Ministry of Agriculture and Forestry) to 41 provincial governorships, for its part, stated that the Law would also apply to areas “registered as olive groves in the land registry but bearing no olive trees”. In an action brought by an owner in Kaş (Antalya), whose land was registered as an olive grove but who argued that olives had not been grown on it, the 8th Chamber annulled that part of the letter by majority: a letter with no statutory basis and limited accessibility cannot determine which immovables the restriction in art. 20 applies to. The dissenting opinion takes the view that the Law applies to all existing and potential olive grove areas.

Council of State Decision
Council of State, 8th Chamber, E. 2024/254, K. 2026/921, 19.02.2026 (given as a court of first instance, by majority; open to appeal, may not be final)

“the olive grove area is not defined in Law No. 3573; the Law predominantly and primarily contains rules on how areas under the authority and disposal of the State are to be used by farmers for olive production, how ownership of those places is accordingly to be acquired, and the assistance to be given to farmers … whereas the regulatory act at issue determines which immovables the Law is to apply to, in other words the scope of the restriction introduced by article 20 of the Law.”

This article’s own inference is as follows: whether land is an olive grove area cannot be tied to the land registry entry alone or to a calculation of decares; in the decisions read, the actual situation was investigated by on-site inspection and expert examination.

Law No. 3573 art. 20: The Facility Ban, 3 Kilometres and the 10% Limit

Statutory Provision — Law No. 3573 on the Improvement of Olive Cultivation and the Grafting of Wild Olives art. 20 (As amended: 28/2/1995-4086/art. 5; second paragraph as amended: 23/1/2008-5728/art. 99)

“No facility that leaves chemical waste or emits dust and smoke such as to hinder the vegetative and generative development of olive groves, with the exception of olive oil factories, may be built or operated within olive grove areas or at a distance of at least 3 kilometres from these areas. The construction and operation of olive oil factories and small-scale agricultural industry enterprises to be built in these areas is subject to the permission of the Ministry of Agriculture and Rural Affairs.

… Olive-growing areas may not be reduced. However, where olive grove areas within municipal boundaries are brought within the zoning limits, total construction, including infrastructure and social facilities, may not exceed 10% of the olive grove area. The uprooting of olive trees in these areas is subject to the permission of the Ministry of Agriculture and Rural Affairs based on technical grounds. In granting this permission, the favourable opinion of the research institutes attached to the Ministry of Agriculture and Rural Affairs and, where one exists locally, of the chamber of agriculture is obtained. Even in that case, an olive tree for which no definite necessity is seen may not be cut down or uprooted. Those who cut down or uproot trees without permission are given an administrative fine of sixty Turkish liras per tree. Zoning plans relating to olive grove areas that became final before the publication of this Law are valid.”

Apart from permission to uproot, the article contains three rules:

  • The facility ban. The ban targets not every structure but facilities that leave chemical waste or emit dust and smoke such as to hinder the development of the olive groves; it covers the olive grove area itself and, in the words of the article, “a distance of at least 3 kilometres” from these areas.
  • Facilities subject to permission. Olive oil factories and small-scale agricultural industry enterprises are subject to Ministry permission.
  • The ban on reduction and the 10% limit. Olive grove areas may not be reduced. The exception in the Law is where a grove within municipal boundaries is brought within the zoning limits; total construction, including infrastructure and social facilities, may not exceed 10% of the area. For an olive grove area outside municipal boundaries the article contains no construction exception.

The article treats zoning plans that became final before its publication as valid; art. 24 of the Regulation explains that date as the publication of Law No. 4086 of 28.2.1995. The article states no separate sanction for breach of the facility ban; in the decisions read, the ban was applied in annulment actions against permits, licences or expropriation acts that contravened it.

Permission to Cut Down or Uproot Olive Trees and the Fine

Uprooting olive trees in olive grove areas is subject to Ministry permission “based on technical grounds”. The favourable opinion of the research institutes and, where one exists, of the chamber of agriculture is obtained; art. 24 of the Regulation also lists the directorates attached to the Ministry. Even then, a tree for which no “definite necessity” is seen may not be cut down or uprooted. The article speaks of trees “in these areas”; whether it applies to the odd tree in a garden that is not an olive grove area cannot be read from the text.

Cutting or uprooting without permission attracts an administrative fine per tree. The amount in the text of the Law is sixty Turkish liras; under art. 17/7 of the Misdemeanours Law (Law No. 5326), administrative fines are applied as increased by the revaluation rate with effect from the start of each calendar year. The current amount has not been calculated in this article. The fine is decided by the local civil administrator (art. 21). The provisions of Law No. 3573 that were read show no separate remedy; under art. 3 of the Misdemeanours Law the general remedy below applies in that case (this is the article’s own inference).

Statutory Provision — Misdemeanours Law (Law No. 5326) art. 27/1 (Remedy)

“An application may be made to the criminal court of peace against an administrative sanction decision concerning an administrative fine or the transfer of ownership to the public, within fifteen days at the latest from the date the decision is notified or pronounced. If no application is made within this period, the administrative sanction decision becomes final.”

Mining in Olive Groves and Provisional Article 45 of the Mining Law

On 01.03.2022 the Ministry of Energy and Natural Resources had added a paragraph to article 115 of the Mining Regulation: where mining aimed at electricity needs coincided with land registered as an olive grove in the land registry, the Ministry could, provided that no other area was available and that rehabilitation was undertaken, permit the olive grove to be relocated and mining to be carried out on the site. The 8th Chamber of the Council of State unanimously annulled the amendment on 04.09.2024. According to the Chamber, as regards olive grove areas the reference to “the provisions of the relevant law” in art. 7/7 of the Mining Law, as it then stood, is a reference to Law No. 3573; that Law allows only olive oil factories and small-scale agricultural industry enterprises in olive grove areas.

Council of State Decision
Council of State, 8th Chamber, E. 2022/2641, K. 2024/4309, 04.09.2024 (given as a court of first instance; reasoning for annulment)

“since activities in olive grove areas that are under protection pursuant to Law No. 3573 on the Improvement of Olive Cultivation and the Grafting of Wild Olives must be regulated by statute and, in fact, the defendant Ministry of Energy and Natural Resources has no power to regulate this field on its own by regulation, this argument of the defendant administration has not been accepted.”

The defendant administration’s appeal was deemed not to have been lodged because the postage requested was not paid in time (Council of State, Assembly of Administrative Law Chambers, E. 2024/3136, K. 2025/431, 26.02.2025). The 8th Chamber repeated the same reasoning by majority in an action brought by a professional chamber (Council of State, 8th Chamber, E. 2024/1139, K. 2025/9384, 03.12.2025); that decision is open to appeal. The Mining Regulation now in force is dated 11.12.2022; a search of its current text made for this article found no provision on olive groves.

The first paragraph of provisional article 45, added to the Mining Law by article 11 of Law No. 7554 of 19/7/2025, reads:

Statutory Provision — Mining Law (Law No. 3213) provisional art. 45/1 (Added: 19/7/2025-7554/art. 11)

“Where mining activities carried out to meet the country’s electricity needs by natural or legal persons who are licence holders or royalty contractors on the date this article enters into force coincide with areas, within the boundaries of the Map and Coordinate List annexed to this Law, that are registered as olive groves in the land registry or on which olive groves in fact exist, and the activities cannot be carried out in other areas, the Ministry may, taking the public interest into account, permit the olive trees in the part where mining is to be carried out to be relocated, giving priority to the district and province in which the mining sites are located, mining activities to be carried out on the site and temporary facilities relating to those activities to be built.”

The field of the article is narrow: those who were licence holders or royalty contractors on that date, mining aimed at electricity needs, the areas in the list annexed to the Law, and the impossibility of carrying out the activity elsewhere. If the trees cannot be relocated, permission may be granted only if an olive grove of equivalent size, with at least twice the number of trees relocated and not relocated, is established in an area determined by the Ministry in line with expert opinions. Where Treasury land is needed for the new olive groves and the relocated trees, Treasury land found suitable by the Ministry of Environment, Urbanisation and Climate Change, or land of state economic enterprises within the province where the mining sites are located, may be leased directly for twenty years to owners whose olive groves are expropriated and who so request. The areas covered by the annexed list have not been examined in this article.

Note. Art. 7/7, on which the 8th Chamber relied, was also amended by Law No. 7554; the current seventh paragraph begins with the sentence “Even if the area becomes subject to permission after the licence has been issued, mining activities shall continue”. Law No. 3573 art. 20, for its part, has not been amended. No decision concerning acts taken after the amendment has been read; that art. 20 continues to apply to olive groves outside the list is this article’s own inference.

Procedure: Annulment Action, Time Limits, Standing and Stay of Execution

An EIA decision, a mining or forest permit, a zoning plan, an urgent expropriation decision, a regulation or a Ministry letter affecting an olive grove area may be challenged by an annulment action. The general conditions under Turkish law are explained in The Annulment Action in Administrative Jurisdiction.

Competent court. In the decisions read, actions against a regulation, a Ministry letter and a Presidential decision were heard at first instance by the Council of State; actions against a governorship’s EIA decision and against a forest permit granted by the General Directorate of Forestry were heard by the administrative court. The rules on jurisdiction are not examined separately in this article.

Time limit. The general time limit is sixty days.

Statutory Provision — Administrative Jurisdiction Procedures Law (Law No. 2577) art. 7 (Time limit for bringing an action; paragraph 1 and the first two sentences of paragraph 4)

“The time limit for bringing an action is sixty days before the Council of State and the administrative courts and thirty days before the tax courts, where no separate period is specified in the special laws.

… For regulatory acts that must be announced, the time limit starts on the day following the date of announcement. However, upon the application of these acts, those concerned may bring an action against the regulatory act, the act applied, or both together.”

EIA decisions and urgent expropriation acts fall under the expedited procedure:

Statutory Provision — Administrative Jurisdiction Procedures Law (Law No. 2577) art. 20/A (Expedited procedure; selected sub-paragraphs)

“(b) Urgent expropriation acts.

… (e) Decisions taken as a result of environmental impact assessment under the Environment Law No. 2872 of 9/8/1983, excluding administrative sanction decisions.

… (a) The time limit for bringing an action is thirty days.

… (e) Decisions to be given on a request for a stay of execution are not open to objection.”

In these actions article 11 of the Law does not apply and the time limit for appeal is fifteen days. The starting point of the time limit for zoning plans is not covered in this article.

Standing. An annulment action may be brought by “those whose interests have been infringed” (art. 2/1-a). In the decisions read, the actions were brought by owners and by persons with a house or garden nearby; the dispute over standing arose in institutional actions against regulatory acts. The Assembly of Administrative Law Chambers held, by majority, that a public servants’ union lacked standing in its action against the amendment to the Mining Regulation, and quashed the 8th Chamber’s annulment decision.

Council of State Assembly of Administrative Law Chambers Decision

“nor is it legally possible to conclude that the plaintiff Union has standing to sue on the basis of the concept of the general public interest, which is not among the conditions relating to standing that are laid down by the Law and explained above.”

The dissenting opinion argues that the interest requirement should be interpreted so as to serve the purpose of the rule of law. As reported in the 8th Chamber’s decision of 03.12.2025, on 30/11/2023 the Assembly accepted that a professional chamber had a sufficient interest to challenge the same provision. A Constitutional Court decision on the standing of unions is examined in a separate case note.

Stay of execution. Bringing an action does not by itself suspend the act (art. 27/1); two conditions are required together.

Statutory Provision — Administrative Jurisdiction Procedures Law (Law No. 2577) art. 27/2 (Stay of execution; first sentence)

“The Council of State or the administrative courts may decide to stay execution, giving reasons, after the defence of the defendant administration has been received or the time for defence has expired, where the conditions that the implementation of the administrative act would give rise to damage that is difficult or impossible to remedy and that the administrative act is clearly unlawful are met together.”

Because the felling of trees cannot be undone, it is important to make the request together with the petition and with concrete data.

Olive Grove Areas in Court Decisions

EIA and the 3-kilometre test. An administrative court had annulled an “EIA Not Required” decision for a geothermal power plant in Efeler (Aydın) on the ground that the plant was among the facilities that cannot be built within 3 kilometres of olive grove areas. The 4th Chamber quashed that judgment with final effect. The judgment under appeal had been given after the proceedings were reopened following a violation judgment of the European Court of Human Rights. According to the Chamber, in view of the 8th Chamber’s annulment decision, facilities emitting chemical waste, dust and smoke cannot be built within 3 kilometres even with a public interest decision; but it must first be established whether the project is of that kind.

Council of State Decision
Council of State, 4th Chamber, E. 2024/3997, K. 2025/1706, 17.03.2025 (the Chamber’s reasoning for quashing; by majority, final)

“in actions brought for the annulment of EIA decisions given for projects to be carried out in areas of this kind, it must first be examined whether the project at issue leaves chemical waste, or emits dust and smoke, such as to hinder the vegetative and generative development of the olive groves.”

The Chamber found inadequate an expert report that did not assess in concrete terms the effect of a system described in the project file as closed-loop, and required an on-site inspection with a new panel. Conducting the proceedings in the absence of the company that owned the project was also held to be contrary to procedure.

Easements and urgent expropriation. The 6th Chamber dismissed an action against an urgent expropriation decision aimed at establishing an easement over olive grove parcels for a geothermal fluid pipeline in Kuyucak (Aydın); the reporting judge and the prosecutor had advised annulment.

Council of State Decision
Council of State, 6th Chamber, E. 2024/3780, K. 2025/2245, 24.04.2025 (given as a court of first instance; reasoning for dismissal; open to appeal, may not be final)

“it is concluded that the establishment of an easement over the parcels in dispute does not, at this stage, prevent the use of the agricultural land, that is, the carrying on of agricultural activity, and that for this reason there can be no question of a non-agricultural use under Laws No. 5403 and No. 3573.”

The decision also records the provincial directorate’s opinion that 10% of the parcels had not been exceeded, and that permission for non-agricultural land use under Laws No. 5403 and No. 3573 must be obtained before construction begins. The decision is specific to its facts: it concerns a pipeline for which only an easement was established. The owner’s rights to compensation and easement payments are explained in the guide to geothermal expropriation, the urgency requirement in the case note on urgent expropriation, and compensation routes in Expropriation and the Owner’s Rights.

Investigating nearby olive groves. An action against a forest permit granted for a limestone quarry in Aydıncık (Mersin) had been dismissed on the basis of an expert examination made from the forest standpoint. Noting that the report contained no assessment of the claim that there were olive groves near the permit area, the 8th Chamber quashed the judgment with final effect.

Council of State Decision

“taking the provisions of Law No. 3573 into account, it must be established whether there are olive grove areas near the permit area at issue and, if there are, the distance of those areas from the permit area at issue and the likely effects of the activities in question on the olive groves.”

Practical Points

  • Do not rest the olive grove status of land on the land registry entry alone; document the actual presence of trees as well.
  • The decisions of 19.02.2026, 03.12.2025 and 24.04.2025 were given at first instance and are open to appeal; they may not be final.
  • Make distance and effect concrete in the petition: the distance to the olive grove and the facility’s waste, dust and smoke characteristics. The 4th Chamber did not accept abstract and general reservations as sufficient.
  • An association, professional chamber or union that intends to sue should show in the petition the link between its founding purpose and the act.

Frequently Asked Questions

Can a factory or other facility be built in or near an olive grove in Türkiye?

As a rule, no. Under Turkish law (Law No. 3573 art. 20), no facility that leaves chemical waste or emits dust and smoke such as to hinder the development of olive groves may be built or operated within olive grove areas or within 3 kilometres of them. Olive oil factories and small-scale agricultural industry enterprises are subject to Ministry permission. In a 2025 decision the 4th Chamber of the Council of State required the court first to establish whether the facility is of that kind.

What is an olive grove area under Law No. 3573 in Türkiye, and is a land registry entry enough?

The Law does not define an olive grove area. The definition in the Regulation, which required at least 25 decares, was annulled by the 8th Chamber of the Council of State. On 19.02.2026 the same Chamber annulled, by majority, the relevant part of a Ministry letter stating that the Law also applies to land registered as an olive grove but bearing no olive trees; that decision may not yet be final. No single settled criterion appears in the decisions read.

Is permission needed to cut down or uproot an olive tree in Türkiye, and what is the penalty?

Under Turkish law, uprooting olive trees in olive grove areas requires Ministry permission based on technical grounds; a tree may not be cut down or uprooted unless there is a definite necessity (Law No. 3573 art. 20). Cutting or uprooting without permission attracts an administrative fine per tree. The amount in the text of the Law is sixty Turkish liras; administrative fines are applied as increased each year by the revaluation rate. As the provisions of the Law that were read show no separate remedy, on this article’s own inference the fifteen-day application under art. 27 of the Misdemeanours Law applies against the fine.

Can mining be carried out in an olive grove area in Türkiye?

According to the 8th Chamber of the Council of State, absent a separate statutory provision, mining in olive grove areas in Türkiye may be carried out only within the framework of Law No. 3573; the permission clause added to the Mining Regulation in 2022 was annulled on that ground. Those decisions rest on the text of art. 7 of the Mining Law before it was amended in 2025. Provisional article 45, added by Law No. 7554 of 19/7/2025, allows the Ministry to grant permission only in the areas listed in the annex to the Law, for mining aimed at the country’s electricity needs by those who were licence holders or royalty contractors on that date, and provided that no other area is available.

Can an olive grove area within municipal boundaries be opened to development under Turkish law?

Under Law No. 3573 art. 20, olive grove areas may not be reduced. The exception in the Law is where an olive grove area within municipal boundaries is brought within the zoning limits; in that case total construction, including infrastructure and social facilities, may not exceed 10% of the olive grove area. The article treats zoning plans that became final before its publication as valid; art. 24 of the Regulation explains that date as the publication of Law No. 4086 of 28.2.1995.

What is the time limit for challenging a facility, mining permit or EIA decision affecting an olive grove in Türkiye?

Under Turkish law, an annulment action against an administrative act is, as a rule, brought within sixty days from the day following written notification (Law No. 2577 art. 7). Decisions taken as a result of environmental impact assessment and urgent expropriation acts are subject to the expedited procedure; the time limit is thirty days and a decision on a stay of execution is not open to objection (art. 20/A). For regulatory acts that must be announced, time runs from the day following the announcement.

Related Articles

This article is for general information purposes only and does not constitute legal advice. Statutory texts are taken from the Official Legislation Information System and decisions from the official case-law database. The decisions cited are not cases handled by the firm.

Author:

If you have a question on this topic

This article was written by Av. Bayram Can Çapar. At Av. Bayram Can Çapar · ÇAPAR Hukuk, we provide legal services with our team in Denizli, İzmir, Aydın, Muğla, Manisa, Uşak, Afyonkarahisar, Kütahya, İstanbul and Ankara, Türkiye.

+90 258 241 55 54 · info@capar.av.tr · Send a message

Other articles in Administrative Law

All Administrative Law articles →

Cite as: Av. Bayram Can Çapar, “Building, Facilities and Mining in Olive Groves in Türkiye: Law No. 3573, Prohibitions and Legal Remedies”, ÇAPAR Hukuk, 2026-11-15, https://capar.av.tr/en/article/olive-groves-facilities-mining-law-3573-turkiye

← All articles

Latest Articles

All articles ›